[에너지신문] 29 April 2016 - The turbine manufacturer Gamesa has receives an order from Enel Green Power to supply 65 G114-2.1 MW wind turbines for the Babilonia wind complex located in the municipality of Morro do Chapéu, Bahia, Brazil. Gamesa will transport, install and commission the turbines with commissioning planned during the second half of 2018.

http://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/gamesa-will-supply-turbines-babilonia-wind-complex-brazil_36955.html

저작권자 © 에너지신문 무단전재 및 재배포 금지